Area/Topic  |  Bibliography   |  Background   |  Hypotheses   |  Home


 
 

KRIS Gualala : Picture Page

Area North Fork
Topic Tour: Restoration Photos NF Gualala 1992
 

drynf2_sm.jpg 40K  Click on image to enlarge (40K).  Click here to display a larger version (311K).

Gualala River Steelhead Project volunteer in the bed of Dry Creek in 1992 preparing to install deflectors to help accelerate scour and restore surface flow. Image taken from video provided by Doug Simmonds.


drynf92_sm.jpg 47K  Click on image to enlarge (47K).  Click here to display a larger version (409K).

Gualala River Steelhead Project volunteers in the bed of Dry Creek in 1992 preparing to install deflectors to help accelerate scour and restore surface flow. Image taken from video provided by Doug Simmonds.


nfchoke_sm.jpg 46K  Click on image to enlarge (46K).  Click here to display a larger version (413K).

Gualala River Steelhead Project volunteers cable a log in place to help accelerate scour and restore surface flow. Image taken from video provided by Doug Simmonds.


nfrbrest_sm.jpg 56K  Click on image to enlarge (56K).  Click here to display a larger version (461K).

Restoration project site for the Gualala River Steelhead project. It appears that an old debris jam has given way and that the stream is down cutting through the old deposit. For progress and after photos of the same location see Pictures #5 and #6. Image taken from video provided by Doug Simmonds.


nfrbrst2_sm.jpg 49K  Click on image to enlarge (49K).  Click here to display a larger version (435K).

Gualala River Steelhead Project volunteers surveying old wood and sediment as they prepare for restoration project. Image taken from video provided by Doug Simmonds.


nfrbrst3_sm.jpg 50K  Click on image to enlarge (50K).  Click here to display a larger version (444K).

This image shows the same location as Picture #4 with logs rearranged to allow fish passage and sediment routing. Image taken from video provided by Doug Simmonds.


nfrob2_sm.jpg 54K  Click on image to enlarge (54K).  Click here to display a larger version (467K).

Large wood crossing and parallel the channel of the North Fork Robinson Creek was installed by the Gualala River Steelhead Project in cooperation with Gualala Redwoods Inc.


nfwilpl_sm.jpg 56K  Click on image to enlarge (56K).  Click here to display a larger version (449K).

Gualala River Steelhead Project volunteers collect willow sprigs for a bank revegetation project. Image taken from video provided by Doug Simmonds.





 
 
  www.krisweb.com